Dates of signing contract / commissioning :
Jun.1st ,2007/Oct.31st ,2011
Contents of project:
- 2x40 top charging coke oven battery with production 750,000 t/a
-Coal transportation system
-Coke oven battery plant
- Coke transportation system
-Gas purification plant
-COG and BFG gas pipe line system
-BFG stationary bag house unit and blower system
-Auxiliary facilities
Features of major design:
-Coke making plant
2x40 ovens top charging coke oven battery with chamber height of 6m.
- Gas purification plant
The capacity of gas purification plant is 45,000m3/h including gas condensation and exhauster unit, final cooling , benzol scrubbing unit and crude benzol distillation unit
Scope of contracting:
ACRE had been responsible for complete basic engineering, detailed engineering, training, equipment & material supply, commissioning, technical service and project management.
Project Highlights:
It had adopted
JN60- 6type coke oven is twin-flue,COG under-jet and BFG gun flue, compound structure oven with waste gas circulation. The 2x40 ovens are compound ,single collecting main coke oven battery.