TAR REFINERY PROJECT WITH 0.12MT/A FOR YUNNAN DAWEI COKE MAKING CO.,LTD
SOURCE: AUTHOR:acre_en DATE:02 September 2021 VIEW:4
+ . -
Client: Yunnan Dawei Coke Making Co.,ltd
Contractor:ACRE
City of project site :Qujing, China
Dates of signing contract / commissioning :

May 28th ,2008/ July 15th ,2009

84841479095638

Contents of project:

The scope of project with capacity of 0.12 Mt/a for this project shall mainly include hydrogenation reactor unit, pre-distillation unit, extractive distillation unit, xylene distillation unit, releasing & bleeding unit, condensing water unit, etc

auxiliary production facilities including plant roads and environmental measures, wastewater treatment station, water supply & circulating system, communication system, instrumentation and process automatic facilities, de-dusting & ventilation facilities, power supply & distribution system etc.

Features of major design:

1. High active Ni-Mo and Co-Mo Catalyst and

High selective N-Formylmorpholine extracting solvent had been provided to effectively remove nonaromatics,sulfide,nitride and other impurity.

2. The waste heat from the process had been fully used to reduce energy consumption and increase economic effectiveness of enterprise.

Scope of contracting:

ACRE had been responsible for this project based on Engineering + Procurement and Construction:

- Detailed design

- Procurement & Manufacture of Equipment & Material

- Construction , installation of Process equipment, testing of parameters, training of operational personnel test run, etc.

Project Highlights:

In this project, the purity of benzene had been above 99.9% and the purity of phenylmethane had been above 99%.

Nontoxic solvent had been adopted and No waste residue will be produced from process.